Continuing the implementation of comprehensive measures to modernize the engineering infrastructure, as well as within the framework of the execution of the instructions of the General Director of the Republican Veterinary Laboratory, in 2025 the repair and construction department has carried out another stage of socially and industrially significant work aimed at improving the working conditions of workers, increasing energy efficiency and ensuring the uninterrupted functioning of the facilities of the Enterprise.
Within the framework of construction and installation work, a number of laboratory network objects have been connected to centralized engineering communications.
The following are connected to the centralized water supply systems:
- The Beineu RVL of the Mangystau regional branch;
- The residential RVL of the Atyrau regional branch.
To the centralized systems of heat supply are connected:
- The Algy RVL of the Aktobe regional branch;
- Auliekol RVL of the Kostanay regional branch.
In addition, on the instructions of the General Director of the Enterprise in 2025, the project-smete documentation was developed with positive conclusions of a comprehensive non-departmental examination on the connection of objects to centralized sources of heat supply, gas supply and engineering infrastructure with subsequent implementation of projects in 2026.
The list of objects includes the Panfilovsk, Kerbullak RVL of the Jetisus regional branch, the Ordabasin, Baydibek, Tolebi, Turkestan and Saragash RVL of the Turkestan regional branch, the Uyghur, Enbekshikasakh RVL and the Shelek RVL of the Almaty regional branch, the Shuk RVL of the Zhambyl regional branch, the Jarkaya RVL of the Akmola regional branch, as well as the Astana regional branch.